|
The bunkering delivery procedures systemically adhere to the following :
1. Pre-delivery conference with vessel and surveyor, if engaged.
2. Pre-delivery safety checklist and documentation.
3. Bunker requisition form and specifications.
4. Sampling requirements and procedures.
5. Delivery procedures.
6. Emergency shut down procedures
7. Port-delivery checks, calculation, documentation and samples distribution.
8. Stock movement log for record keeping.
|